
Add to Cart
Automatic Special Purpose Truck 4x2 8m3 Vacuum Sewage Suction Tanker Truck
SINOTRUK HOWO Special Purpose Truck 4x2 8m3 Vacuum Sewage Suction Tanker Truck
1) Simple structure in linear type ,easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts ,electric parts and operation parts.
Name: Engine
Brand: Yu chai
Original: China
Name: Transmission
Brand : DC
Original: China
Manual , 7 forward and 1 reverse
Name: Tanker
Brand: SINOTRUK
Original: Jinan
5-10L
Name: Tyre
Brand: Trangle
Model : 9.00R20 Radial Tyre
Specification of Special Purpose Truck 4x2 8m3 Vacuum Sewage Suction Tanker Truck
Item | unit | parameter | ||
Vehicle model | Vacuum suction Truck | |||
Overall dimensions | mm | 8310×2495×3350 | ||
Fact cubage | m3 | 10m3 | ||
Curb weight | kg | 7705 | ||
Tank dimensions | mm | 4880×1720 | ||
Wheel base | 4500 | |||
F/R track base | 1205/2605 | |||
Approach/departure angle | ° | 25/18 | ||
Engine Model | 190HP,4 cycle,six cylinder,turbo charge,water cooling diesel engine | |||
Traction system | 4×2 | Transmission | 6Forwarder&1 Reverse | |
Tire specification | 10.00-20 | Tire Amount | 6+1 | |
Operation control system | Power Steering | Electric system | 24v | |
Cabin details | Sleeper-bed,seat1+2,windshield wiper,Lockable doors,Air-conditioner, cabin heater,Outside rear view mirrors, AM / FM radio,Standard set of front, rear and side lights, Standard set of indicators and gauges and so on. | |||
Equipment | 1.Equipped with vacuum pump(rating rotate speed=1400r/m,mini rotate speed>800r/m, max suction lift>6m, vacuum>500mmHg, clockwise) 2.Equipped PTO, give power to vacuum pump work,transmission shaft, fecal tank, pipe network, fecal pipe for observing and cleanout equipment. 3.Tank lift dump, rear hydraulic opened and closed, manual locking. 4.Time for full suction<8min | |||
Packaging | ||||
Size | 7750x2500x3750mm | |||
Weight | 5-9T | |||
Shipment | 1. By Bulk 2. BY Ro-Ro 3. By Frame 4. By Container |
1. Wax:
Do swax protective measures to against the trailer body suffer seawater corrosion during shipping.
2. Tarpaulin
It can effectively prevent the goods in the sun and rain during transport
Advantages
Vacuum pump
Italian imported vacuum pump
FAQ
Q : What's the lead time?
A : It usually takes round 12 days to finish the common low bed trailer, container trailer, skeleton trailers after confirming the order. Oil tanker trailr , Bulk Powder Dust Flour Material Heavy Duty Semi trailer and special trailer needs round 20 days.
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance. Welcome to check your producing process.
Packing and Shipping
We supervise the process from the factory to the port designated by the customer to ensure that the customer's products arrive at the destination accurately and safely.
Comply with export packaging requirements at any china port.
More photo for your reference
Delivery:
Within 30 work days after receive the payment
Our customer all over the world:
Congo, Tanzania, Djibouti, Angola, Chad, Algeria, Sudan, Libya, Eritrea, Uganda, Rwanda, Burundi and the Seychelles. Mauritania, Western Sahara, Senegal, Gambia, Mali, Burkina Faso, Guinea, Guinea-Bissau, Cape Verde, Sierra Leone, Liberia, Côte d'Ivoire, Ghana, Togo, Benin, Niger, Nigeria , Namibia, Cameroon, Equatorial Guinea, Ethiopia, Kenya , Gabon and Zambia, Angola, Zimbabwe, Malawi, Mozambique, Botswana, and so on.
Russia, Kazakhstan, Kyrgyzstan, Bangladesh, Azerbaijan, Vietnam, Laos, Cambodia, the Philippines, Malaysia and so on.
Brazil, Bolivia, Uruguay, Peru, Ecuador , Trinidad and Tobago , Chile, Barbados , Argentina, Dominica, Cuba, and so on.
Welcome you join our client team , to Expand the territory!